Cloud Migration Checklist: Plan, Move and Optimise

A step-by-step cloud migration checklist for AWS, Azure and Google Cloud: assessment, the 6 Rs, security, cutover planning and cost optimisation.

NW

Northwind Studio Engineering

Editorial Pod

Architecture & Practice Brief

Before You Start

A cloud migration succeeds or fails in planning. Moving servers is the easy part; understanding dependencies, data and people is the hard part. Use this checklist whether you are moving to AWS, Microsoft Azure or Google Cloud.

Phase 1: Assess

  • Inventory every application, database, scheduled job and integration.
  • Map dependencies between systems, including the undocumented ones.
  • Record current performance, availability and monthly cost as a baseline.
  • Identify compliance requirements such as data residency, HIPAA or PCI DSS.
  • Agree the business goal: lower cost, better resilience, faster releases or retiring a data centre.

Phase 2: Choose a Strategy for Each Application

The widely used "6 Rs" framework:

  1. Rehost: lift and shift with minimal change. Fastest, but keeps old inefficiencies.
  2. Replatform: small changes such as moving to a managed database.
  3. Refactor: redesign for cloud-native services. Most effort, most long-term benefit.
  4. Repurchase: replace with a SaaS product.
  5. Retire: switch off what nobody uses.
  6. Retain: keep on-premises for now.

For tightly coupled legacy systems, an incremental approach such as the Strangler Fig pattern reduces risk.

Phase 3: Build the Landing Zone

  • Account or subscription structure, separated by environment.
  • Identity and access management with least privilege and single sign-on.
  • Network design, encryption defaults and logging.
  • Infrastructure as code (for example Terraform) so environments are reproducible.
  • Budgets and cost alerts from day one.

Phase 4: Migrate

  • Start with a low-risk application to prove the process.
  • Replicate data continuously before cutover to keep downtime short.
  • Automate deployments with a CI/CD pipeline. See our DevOps and CI/CD service.
  • Write a cutover runbook with a rollback plan and named owners for each step.

Phase 5: Validate

  • Compare performance against the baseline.
  • Run functional, security and failover tests.
  • Confirm monitoring, alerting and backups work as expected.
  • Get sign-off from business owners.

Phase 6: Optimise

  • Right-size instances based on real usage.
  • Use autoscaling and managed services to reduce idle capacity.
  • Consider commitment discounts once usage is stable.
  • Review costs monthly and tag every resource by owner and environment.

Common Mistakes

  • Migrating without a dependency map.
  • Underestimating data transfer time for large databases.
  • Leaving old infrastructure running and paying twice.
  • Treating security as a final step instead of a design input.

Our cloud architecture and migration team plans and executes migrations with zero-downtime cutover strategies.

Frequently Asked Questions

How long does a cloud migration take?

A single application can move in weeks. A full data-centre exit usually takes several months and is done in waves.

Will moving to the cloud reduce my costs?

It can, but only with right-sizing, autoscaling and active cost management. A pure lift and shift sometimes costs more at first.

Which cloud provider should I choose?

Choose based on your team's skills, the managed services you need, compliance requirements and existing licences. All three major providers are capable.

How do I avoid downtime during migration?

Replicate data continuously, test the cutover in rehearsal, and switch traffic gradually with a tested rollback plan.